Project · Offices & Hotels

Equipotential bonding in the main LV switchboard room of an office building

Equipotential bonding on the equipment of the main switchboard room: conductors run, fixed and connected to the earth bars.

01

The starting point

In the electrical room of an office building, the equipment had to be connected by equipotential bonding.

02

Our work

Equipotential bonding of the room's equipment: green-and-yellow conductors run, neatly fixed and connected to the earth bars.

03

The result

Metal parts bonded together and to earth, for an electrical room that is safer for the people working in it.

The project in detail

In the electrical room of this office building in Seine-Saint-Denis, which houses the main low-voltage switchboard, we carried out the equipotential bonding of the equipment.

The green-and-yellow conductors were run and neatly fixed along the walls, ducts and cable trays, then connected to the earth bars. Bonding the metal parts together and to earth limits potential differences in the event of a fault and protects the people working in the room.

In pictures

The project in photos

Click a photo to enlarge it.

01

The site

3 photos

The electrical room — Main LV room, offices (93)
The electrical roomThe office building's electrical room, with its cubicles and equipment.
The main LV switchboard — Main LV room, offices (93)
The main LV switchboardThe main low-voltage switchboard that distributes power throughout the building.
Overall view of the switchboard — Main LV room, offices (93)
Overall view of the switchboardThe switchboard cabinets and the cable trays running to the floors.
02

After

6 photos

Earth bars — Main LV room, offices (93)
Earth barsThe equipotential bonding conductors are connected to the earth bars, marked by their symbols.
Bonding to the transformer — Main LV room, offices (93)
Bonding to the transformerThe green-and-yellow conductor runs down the wall to the transformer.
Conductor routing — Main LV room, offices (93)
Conductor routingA clean route, fixed to the wall and under the cable tray.
Bonding along the equipment — Main LV room, offices (93)
Bonding along the equipmentThe bonding conductor follows the ducts and cable trays.
Bonding of metal parts — Main LV room, offices (93)
Bonding of metal partsEach metal part is connected to the equipotential bonding network.
Connection detail — Main LV room, offices (93)
Connection detailConnection of the green-and-yellow conductor to the equipment.