01
The starting point
An office floor to be equipped with RJ45 network sockets at every workstation, connected to the network racks.
Project · Offices & Hotels
Sockets marked on plan, cables pulled under the raised floor to every workstation, RJ45 sockets fitted and racks wired.
01
An office floor to be equipped with RJ45 network sockets at every workstation, connected to the network racks.
02
Sockets marked on plan, network cables pulled to each workstation under the raised floor, RJ45 sockets fitted and labelled, then the network racks wired on 2U for the RJ45 sockets.
03
Every workstation has its RJ45 sockets, all labelled and connected to the rack.
On this office floor, each socket was first marked on the plan. We then opened the raised floor and pulled the network cables to every workstation position, through the cable trays and up to the floor boxes. The RJ45 sockets were fitted and labelled one by one.
At the rack, all the cables arrive at the foot of the rack, run up it, dressed and tied, then are connected to the patch panels, wired on 2U for the RJ45 sockets. Every socket on the floor can easily be found in the rack.
In pictures
Click a photo to enlarge it.
2 photos
3 photos
11 photos











5 photos





Video · 59 s · no sound
Before, preparation, pulling, rack, after: the floor cabling in under a minute.